My Calculator

Hole Volume Calculator

Estimate concrete for round or rectangular post holes and footings, with post displacement, waste, and bag count.

Footing Planner

Hole details

Hole shape and size

Post and order settings

Use the yield printed on your concrete bag for a closer bag count. Price is entered in US dollars.

Your estimate

Concrete needed

Live result

Recommended order volume

41.47 Lincluding waste
Concrete bags

2 bags

Holes included

1

Concrete per hole37.7 L
Total before waste37.7 L
Waste allowance3.77 L
Gross hole volume per hole42.41 L
Post volume deducted per hole4.71 L
Planning estimate only. Irregular sides, loose soil, over-excavation, and bag yield can change the amount used.

Visual guide

Concrete hole diagram

Not to scale

The diagram shows the hole profile, post displacement, depth, and order volume from your inputs.

Hole diameter 30 cmDepth 60 cmSchematic view · not to scale
Holes

1

Depth

60 cm

Concrete to order

41.47 L

Concrete bags

2

Step-by-Step Solution

Here's exactly how this answer was calculated, one step at a time.

  1. 1

    Calculate the hole cross-section

    A = π × (15 cm)²

    A round hole uses the circle area formula. A square or rectangular hole uses width multiplied by length.

  2. 2

    Find the gross hole volume

    Hole volume = cross-section area × 60 cm depth

    The cross-section area multiplied by depth gives the volume for one hole.

  3. 3

    Subtract the post and multiply by hole count

    37.7 L per hole × 1 holes = 37.7 L

    The post footprint is removed from each hole when a post is included.

  4. 4

    Add waste and round up to bags

    41.47 L ÷ 25 L per bag = 2 bags

    The waste allowance is added before rounding up to whole bags.

✓ Concrete to order: 41.47 L, approximately 2 bag(s), including waste.

What Is a Hole Volume Calculator?

A hole volume calculator estimates how much concrete is needed to fill a post hole, fence post footing, deck footing, sign base, or other small foundation hole. Enter the hole shape, its width or diameter, its depth, and the number of holes. If a post will sit inside the concrete, include the post size so its volume can be deducted. The calculator then estimates the concrete volume, bag count, waste allowance, and optional material cost.

The tool handles round holes and square or rectangular holes. It can be used for early planning before digging, to compare footing sizes, and to prepare a concrete shopping list. Results are given in litres for metric inputs and cubic feet for imperial inputs, with a cubic yard value included in the result calculations. The estimated number of bags is rounded up using the bag yield you enter.

How Much Concrete Do I Need for a Post Hole?

The answer depends on the hole diameter or width, the hole depth, and whether a post takes up space inside it. A wider hole holds much more concrete because the cross-sectional area grows with the square of its diameter. Increasing depth also adds volume in direct proportion. If the project has several holes, calculate the size of one typical hole and enter the total hole count.

Measure the hole after excavation if possible. Soil can crumble, the sides may not be perfectly straight, and the bottom may be wider than the top. A measured diameter at the top alone can understate the quantity in an irregular hole. If the hole has a bell-shaped base or is significantly tapered, this calculator's straight-sided cylinder or rectangular prism estimate will be low; use the manufacturer's or designer's volume method for that shape.

When a post is installed in the hole, the concrete fills the open space around it. The calculator subtracts the post footprint multiplied by the embedment depth from the full hole volume. The post's exposed part above the ground is not included in the displacement. If you are pouring a concrete pier first and attaching a post base later, choose no post so the full hole is counted.

Hole Volume Formulas

The calculator first finds the cross-sectional area and multiplies it by the depth. For a round post hole, the cross section is a circle. For a square or rectangular footing hole, it is the hole width multiplied by its length. All lengths are converted to a common internal unit before the volume is calculated.

  • Round hole: Volume = π × (diameter ÷ 2)² × depth
  • Rectangular hole: Volume = width × length × depth
  • Concrete around a post: Hole volume − post footprint × depth
  • Order volume: concrete for all holes × (1 + waste percentage ÷ 100)
  • Bag count: round up (order volume ÷ concrete yield per bag)

Round Post Holes and Cylindrical Footings

Many fence post holes and small pier footings are approximately cylindrical. For a cylinder, the radius is half of the diameter, and the cross-sectional area is pi times the radius squared. Multiply that area by the hole depth to find the gross volume. The diameter must be measured across the hole, not entered as the radius. Doubling the diameter does not merely double the concrete: it makes the cross-sectional area four times as large at the same depth.

A hand auger often creates a fairly consistent round hole, which makes the cylinder formula a good planning estimate. Some augers leave a slightly tapered wall or a flared bottom. A post hole digger may create an uneven shape, and wet soil can cave in while the hole is open. Add a realistic waste allowance to account for these conditions, and avoid treating a nominal tool diameter as an exact measurement of every finished hole.

Square and Rectangular Footing Holes

A square or rectangular hole is calculated as a box: multiply its width by its length and then by its depth. This option can be useful for hand-dug footings, pier bases, short retaining structures, and other excavations with flat sides. If the hole is square, enter the same value for width and length. Measure the clear dimensions of the excavated space rather than the size of the post or footing form.

Real excavations may not have perfectly vertical sides. If the top and bottom dimensions differ, a single rectangular prism can only be an approximation. You can estimate by using an average width and length, or calculate the top and bottom sections as separate geometric solids if the shape is strongly tapered. For a designed structural footing, follow the drawing and engineer's dimensions rather than changing the excavation based on a rough volume estimate.

Subtracting Post Displacement

A post inside a concrete-filled hole displaces some of the concrete. The calculator supports round and rectangular post shapes. For a round post it uses the circular cross-sectional area; for a square or rectangular post it multiplies post width by post length. That area is multiplied by the embedded depth and removed from the gross hole volume for each hole.

This deduction is a geometric estimate. It assumes the post is straight, has the same cross-section through the concrete, and extends through the full depth being counted. A tapered wood post, a fluted post, a steel section with a complex profile, or a post that stops above the hole bottom may displace a different amount. For a small post relative to a wide hole, the difference is usually modest; for a large post in a narrow hole, accurate dimensions matter more.

Concrete Bag Yield and Bag Count

A concrete bag's yield is the volume of mixed concrete made by one bag when prepared according to its directions. Yield varies with bag size and product formulation. Enter the published yield shown on the package, using litres in metric mode or cubic feet in imperial mode. The calculator converts that yield to litres internally, divides the total order volume by the yield, and rounds up to complete bags.

Do not confuse the weight printed on a bag with its concrete yield. An 80-pound bag does not produce 80 pounds of volume; the amount of finished concrete is listed separately on the label. For example, if the estimate calls for 0.12 cubic feet and each bag yields 0.6 cubic feet, one bag is still required. If several holes need concrete, calculate the total project quantity together so the bag count is based on the combined volume.

Adding Waste and Ordering Extra Concrete

A waste allowance helps cover over-excavation, soil that falls into an open hole, spillage while carrying or pouring, concrete left in a mixing tub, and variations in the actual hole shape. The right amount depends on how accurately the holes were dug, how they will be filled, and how many separate batches will be mixed. The default percentage is a starting estimate, not a fixed construction rule.

Small jobs still have unavoidable losses. Mixing a full bag when only part of the yield is required may leave unused concrete, and a small footing can be difficult to fill neatly. On the other hand, very large allowances can lead to unnecessary leftover material. Check the concrete bag yield and plan how each batch will be used. Once concrete is mixed, it has a limited working time and should not be saved for a later pour.

Example: Concrete for Several Fence Posts

Suppose you have eight round post holes, each 30 centimetres in diameter and 60 centimetres deep. A round post with a 10 centimetre diameter will sit in each hole. The gross volume of one hole is found from pi times the 15 centimetre radius squared times the 60 centimetre depth. Then the post's 5 centimetre radius footprint is subtracted over the same embedment depth.

The calculator repeats that net volume for all eight holes and adds the selected waste allowance to the combined amount. If the concrete mix yields 25 litres per bag, the total order volume is divided by 25 and rounded up. This example shows why counting post displacement and all holes together can produce a better bag estimate than multiplying one rough guess by the number of posts.

Metric and Imperial Units

Metric mode uses centimetres for hole and post dimensions, litres for bag yield, and litres for the main concrete volume. Imperial mode uses inches, cubic feet for bag yield, and cubic feet for the main result. Changing the unit system converts the displayed hole, post, depth, and bag-yield values so the same project remains on screen in the new units.

Keep the measurements in one unit system at a time. A common mistake is to enter a diameter in inches while the depth is still being treated as centimetres. The unit selector changes all relevant labels and converts the existing numbers; check them after switching if you have rounded measurements. Cost is an optional US dollar estimate based on the calculated number of bags multiplied by the price per bag.

Measure the Hole Before You Buy

For a more useful concrete estimate, measure the actual excavation at several points. Check a round hole near the top, middle, and bottom if it is safe to do so, then use a practical average diameter. For a rectangular hole, check both side dimensions and note any sections that are wider than the rest. Remove loose soil that has fallen into the hole before measuring the usable depth, and decide whether the footing will finish level with grade or extend above it in a form.

The calculator assumes one consistent hole shape and depth for every hole in the count. If one corner post needs a larger footing, calculate that hole separately and add its concrete to the rest of the project quantity. The same approach works for rows of fence posts with a few gate posts that require wider or deeper holes. Splitting different sizes into separate estimates is usually clearer than averaging them into one dimension, and it makes the material order easier to review.

Common Post Hole Concrete Estimating Mistakes

A few simple checks can make a concrete estimate more useful. Confirm whether your measurement is a diameter or radius, check that the post is not wider than the hole, and enter the embedment depth rather than the total post length. Use the bag's stated yield instead of estimating from bag weight. If the hole is oversized or has a loose bottom, adjust the waste allowance or measure the average dimensions again.

  • Entering radius where the calculator asks for diameter, which can greatly understate the concrete amount.
  • Forgetting the number of holes or using different dimensions for holes that are not all the same.
  • Counting concrete that is displaced by a post as though the hole were empty.
  • Using the bag weight instead of the bag's mixed concrete yield.
  • Ignoring a flared base, sloped wall, loose soil, or over-digging.
  • Rounding down the bag count or assuming an opened bag can be stored after mixing.

Safety, Drainage, and Project Requirements

A volume calculator only estimates material. It does not determine a footing's required diameter, depth, reinforcement, post embedment, or capacity. Those requirements can depend on soil, frost depth, wind exposure, structure height, local building rules, and the load carried by the post. Check local requirements, project drawings, and product instructions before digging or pouring. Contact utility services before excavation so buried lines can be located.

Keep the sides of excavations stable and follow safe digging practices. Concrete is heavy and can irritate skin; use the personal protective equipment described on the product label. Plan access, mixing water, and the pour before opening bags. For a structural footing or retaining application, use the specified mix and dimensions and ask a qualified building professional when the design is unclear.

When to Use a Supplier or Product Calculator

This hole volume calculator is most useful for regular, straight-sided holes with a known shape. Use the supplier's concrete calculator or ask the ready-mix supplier when you are ordering truck-delivered concrete, filling many large footings, or working with an irregular excavation. Suppliers can account for their minimum order, delivery access, mix options, and practical overage recommendations.

For bagged concrete, the product data sheet is the best source for yield and mixing instructions. If you change the mix, add aggregate, or use a specialty product, the stated yield may no longer apply. The estimate should be treated as a material planning aid; follow the package and project specifications for the actual pour.

Frequently Asked Questions

How do I calculate concrete volume for a round hole?

Use volume = pi × radius squared × depth. The radius is half the hole diameter. This calculator converts your measurements and can also subtract a post that occupies part of the hole.

How much concrete do I need for a 12-inch post hole?

The amount also depends on the hole depth, post size, bag yield, and waste. Enter the diameter, depth, post dimensions, and bag yield to estimate the total volume and bag count.

Does the calculator subtract the post volume?

Yes. Choose a round or rectangular post and enter its cross-section dimensions. The estimated embedded post volume is deducted from each hole's gross volume.

How many bags of concrete are needed per post hole?

It depends on the hole dimensions and concrete yield per bag. Enter the bag's listed yield and hole measurements; the calculator rounds up to full bags for the total number of holes.

What is the difference between bag weight and bag yield?

Bag weight is the mass of dry mix. Yield is the volume of mixed concrete it produces. Use the yield printed on the package for bag estimates.

Should I add extra concrete for waste?

Usually some allowance helps cover uneven holes, spillage, and material left in mixing containers. Choose a percentage that reflects your site and the product instructions.

Can I use this for rectangular footing holes?

Yes. Select square or rectangular and enter the hole width, length, and depth. For a square hole, enter the same value for width and length.

Can this calculator size a footing for my structure?

No. It estimates volume only. Footing dimensions, depth, reinforcement, and concrete specifications should come from the project design and applicable local requirements.

What if my hole has a bell-shaped bottom?

A straight-sided cylinder or box may underestimate a flared base. Estimate the flared section separately or use a method supplied by your designer or concrete supplier.

Does imperial mode calculate cubic yards?