Crushed Stone Calculator
Calculate the amount of crushed stone needed for a base or path. Get cubic yards, tons, truck loads and cost, with support for multiple layers and stone types.
Driveway, path and patio bases. Packs down tight.
Smooth top layer on paths, leveling under pavers.
2.22 tonnes · 4,900 lb
Estimated material cost
Stone, delivery and materials
Volume to order
1.25 m³ · 44 cu ft
Area covered
Finished layer 1.39 cu yd
Truck loads
About 12 tons per truck
Bags (0.5 cu ft / 14 L)
Bulk delivery is usually cheaper
In words: Three thousand three hundred eighty-one
Weight & cost by layer
| Layer | cu yd | tons | Cost |
|---|---|---|---|
| Crusher run | 1.31 | 1.96 | ₹1,360 |
| Screenings | 0.33 | 0.49 | ₹360 |
Cost breakdown
| Layer 1: Crusher run | ₹1,360 |
| Layer 2: Screenings | ₹360 |
| Delivery | ₹1,500 |
| Contingency (5%) | ₹161 |
| Total | ₹3,381 |
Where your money goes
Share of each item in your estimate.
How much stone at different depths?
Tons needed for your area using Crusher run, with your compaction and waste.
Crushed Stone Calculator: How Much Do You Really Need?
Ordering crushed stone sounds easy until you are standing in the yard with a measuring tape and a dozen questions. Do you buy by the ton or by the cubic yard? How deep should the layer be? Does the stone shrink when you pack it down? Get it wrong and you either run out halfway through the job or end up with a pile of extra stone you have to move by hand.
This crushed stone calculator takes care of the math. Enter the size of your area, choose the type of stone and how deep you want it, and you get the volume, the weight in tons, the number of truck loads and an estimated cost. It works for a driveway base, a garden path, a patio, a shed pad, a French drain or a decorative bed.
You can switch between feet and metres, add more than one layer (for example a thick base and a thin top layer), and change the prices to match what your local supplier charges. It is free, it needs no sign-up, and it updates as you type.
How to Calculate Crushed Stone
The basic idea is simple. First you find the volume of the space you want to fill. Then you add a little extra, because loose stone gets packed down. Finally you turn that volume into weight, because most suppliers sell crushed stone by the ton.
Here is an example. Say you are building a path that is 3 feet wide and 30 feet long, and you want a 4 inch base. The area is 3 x 30 = 90 square feet. Four inches is one third of a foot, so the volume is 90 x 0.33 = 30 cubic feet. Divide by 27 to get cubic yards, and you have about 1.1 cubic yards.
Now add 15 percent for compaction and 5 percent for waste and spillage. That brings you to about 1.34 cubic yards. Crushed stone weighs roughly 1.4 tons per cubic yard, so you need close to 1.9 tons. A good supplier will tell you the exact weight of the stone they sell, so it is worth asking.
For a bigger job, a driveway base of 12 x 50 feet at 6 inches deep, using crusher run at about 1.5 tons per cubic yard, comes out at around 20 tons after compaction and waste. That is about two truck loads, which is why checking the numbers before you call the supplier matters.
How to Use This Calculator
Start at the top and work your way down. There is nothing to memorise. If you are not sure about a setting, the default is a sensible starting point for the project you picked.
- Pick a project type, such as driveway base, walkway, patio, French drain, shed pad or decorative bed. This sets a typical depth, stone type and compaction rate for you.
- Enter your measurements. You can add up to six sections, and each one can be a rectangle, a circle or a triangle. That makes it easy to cover odd shapes.
- Set the depth of each layer and choose the stone type. Add a second or third layer if your design needs one.
- Check the compaction and waste percentages. Higher numbers are safer if your ground is uneven.
- Type in the price you were quoted per ton or per cubic yard. Switch on delivery, fabric, edging, labor or a compactor rental if you want a full project cost.
- Read the results, look at the charts, and copy the summary or download the CSV to share with your supplier.
How Much Does Crushed Stone Weigh?
Weight is the part that confuses most people. A cubic yard is a measure of space, not weight, and different stones weigh different amounts. As a rough guide, crushed stone weighs between 1.2 and 1.5 tons per cubic yard, which is about 2,400 to 3,000 pounds. Finer material and crusher run weigh more because the small pieces fill the gaps between the larger ones.
These are the typical figures this calculator uses. They are close to what many suppliers quote, but moisture and the quarry make a difference, so always check with your own supplier.
- Crusher run or road base: about 1.5 tons per cubic yard
- #57 clean stone: about 1.4 tons per cubic yard
- #3 stone: about 1.35 tons per cubic yard
- #8 stone: about 1.4 tons per cubic yard
- Screenings or stone dust: about 1.5 tons per cubic yard
- Pea gravel: about 1.45 tons per cubic yard
Types of Crushed Stone and What They Are Used For
Not all crushed stone is the same, and picking the wrong type is one of the most common mistakes. The names can sound confusing, but the idea is simple. The number tells you the size of the pieces, and some mixes include fine dust that helps the stone lock together.
Crusher run, also called road base or 3/4 minus, is a mix of stone and fine dust. It packs down hard, which makes it a favourite for driveway, path and patio bases. Clean stone like #57 has no dust at all. The gaps between the pieces let water drain through, so it is the usual choice for French drains and for the layer under a concrete slab.
The larger #3 stone is good for thick bases on soft ground. The small #8 stone works well as a bedding layer under pavers. Screenings, or stone dust, give a smooth top layer for paths. Pea gravel is a little different, because it is rounded rather than crushed, but it is often grouped with crushed stone for garden paths and play areas.
How Deep Should the Stone Layer Be?
Depth depends on the job and on the ground underneath. These are common starting points, not strict rules, so check local advice for your soil and climate.
- Driveway base: usually 4 to 8 inches, thicker if heavy vehicles will use it or the soil is soft.
- Walkway or garden path: about 3 to 4 inches of base, plus a thin top layer if you want a smooth surface.
- Patio or paver base: usually 4 to 6 inches, then a thin layer of bedding material.
- Under a shed or small slab: around 4 to 6 inches of clean stone.
- French drain or trench: often 8 to 12 inches or more, depending on the pipe and the depth of the trench.
- Decorative cover: 2 to 3 inches is enough for looks and weed control.
Why You Need Extra for Compaction and Waste
When you spread loose stone and then pack it down with a plate compactor, it gets denser and the layer gets thinner. If you only order the exact volume of the finished layer, you will come up short. For bases made from crusher run, an allowance of 10 to 20 percent is common. Clean stone does not compact as much, so 5 percent or less is often enough.
On top of that, a little stone is always lost. It spills, it mixes into the soil below, and uneven ground takes more than you planned. Adding about 5 percent for waste is a safe habit. If your ground is rough or you are filling a lot of low spots, go higher.
Running short is annoying and often costs more, because a second small delivery can come with its own fee. A small amount left over is easy to use somewhere else in the yard.
Crushed Stone Cost per Ton and per Cubic Yard
Prices change a lot from one area to another, and they depend on how far the quarry is from your site. In many parts of the US, common crushed stone often sells for somewhere between $25 and $60 per ton, and the cost per cubic yard is that price multiplied by the weight of a yard. Decorative stone and pea gravel cost more. Delivery is usually extra, and many suppliers charge a flat fee per load or by distance.
That is why the calculator lets you enter your own price and choose whether it is per ton or per cubic yard. It converts between the two for you, so you can compare quotes from different suppliers even if they price in different ways. The default numbers are only a starting point.
Remember that the stone is not the only cost. Geotextile fabric, edging, a plate compactor rental and labor can add up. Turn them on in the calculator to see the full picture, and use the contingency box to leave some room for surprises.
Bulk Delivery or Bagged Stone?
For anything bigger than a small garden path, bulk delivery is almost always cheaper. A dump truck brings the stone to your driveway, and you only pay for the weight and a delivery fee. A typical truck carries around 10 to 14 tons, so the calculator shows how many loads you need.
Bagged stone makes sense for tiny jobs, such as filling a small planter or a short stepping-stone path. A bag of half a cubic foot does not go far. You would need around 54 bags to make one cubic yard, which gets expensive and tiring very quickly. The calculator shows a bag count too, so you can see at a glance whether bags are realistic for your project.
Tips for Laying a Crushed Stone Base
Good prep matters more than most people expect. Start by removing grass, roots and soft soil, and shape the ground so water runs away from buildings. If the soil is soft or clay-heavy, lay geotextile fabric first. It keeps the stone from sinking into the soil and keeps the layers separate.
Spread the stone in layers and compact each one before adding the next. Do not make a layer much thicker than about 4 inches at a time, or the bottom will not pack down properly. Lightly dampening crusher run helps it bind. Finish by checking the surface with a long straight board and filling any low spots.
If you are building a path or patio, install edging before you finish the top layer. Edging holds the stone in place and keeps the edges from spreading over time.
Common Mistakes to Avoid
The most common mistake is forgetting compaction and ordering the exact volume. The second is using the wrong stone, for example clean stone as a driveway base where crusher run would pack better. Another mistake is skipping fabric on soft ground, which lets the stone slowly disappear into the soil.
People also mix up units. A cubic yard is not a ton, and square feet are not cubic feet. If a quote seems far off from your estimate, check that you are comparing the same unit. This calculator shows volume and weight side by side to help with that.
Finally, remember that this tool gives an estimate. Stone density, local prices and site conditions all vary, so confirm the final quantity and price with your supplier before you order.
Frequently Asked Questions
How do I calculate how much crushed stone I need?
Multiply length by width by depth to get the volume. Divide cubic feet by 27 to get cubic yards. Add 10 to 20 percent for compaction and about 5 percent for waste. Then multiply by the weight per cubic yard, usually about 1.4 tons, to get tons.
How many tons are in a cubic yard of crushed stone?
Most crushed stone weighs about 1.2 to 1.5 tons per cubic yard. Crusher run is usually on the heavier side, while larger clean stone is a little lighter. Ask your supplier for the exact figure for the material you are buying.
How far does one ton of crushed stone go?
At around 1.4 tons per cubic yard, one ton covers roughly 116 square feet at 2 inches deep, 77 square feet at 3 inches, 58 square feet at 4 inches and 39 square feet at 6 inches. That is before any extra for compaction and waste.
How deep should a crushed stone driveway base be?
Many driveways use 4 to 8 inches of crushed stone, depending on the soil and the weight of the vehicles. Soft soil and heavy use call for a thicker base. A local contractor can tell you what works best in your area.
What is the difference between crusher run and #57 stone?
Crusher run includes fine stone dust, so it packs down firmly and works well as a base. #57 stone is clean, with no dust, so water drains through it easily. That makes #57 better for drainage and crusher run better for a solid, compacted base.
How much extra crushed stone should I order?
For a compacted base, add around 10 to 20 percent for compaction and about 5 percent for waste. For loose decorative stone, 5 percent is usually enough. If the ground is uneven, add more.
Is crushed stone cheaper by the ton or by the cubic yard?
It is the same material, so the real cost is the same. Suppliers just quote it differently. Convert both prices to the same unit before comparing. This calculator can switch between the two for you.
Do I need fabric under crushed stone?
On firm, well-draining soil you may get away without it, but on soft or clay soil it is a good idea. Geotextile fabric keeps the stone from mixing with the soil below and helps the base last longer.
How many truck loads of crushed stone will I need?
A typical dump truck carries around 10 to 14 tons. Divide your total tonnage by that number and round up. The calculator does this for you and uses it to work out delivery fees.
Can I use this calculator for gravel or pea gravel?
Yes. Pick pea gravel from the stone list, or choose the closest size to the gravel you are buying. The math for volume and weight is the same, only the weight per cubic yard changes slightly.